LSZH Cat6 Cable 1000ft SFTP 4 Pair Copper Lan Cable For Network
Conductor
|
Solid Bare Copper
|
AWG
|
23
|
Conductor Dia. (mm)
|
0.585
|
Insulation
|
PE
|
Insulation Dia.(±0.01mm)
|
1.02
|
Filler
|
LDPE
|
Pe-tape
|
Yes
|
Drain wire (TC)
|
0.40
|
Al-foil
|
Yes
|
Braiding
|
Tinned Copper
|
Jacket
|
PVC / LSZH / PE
|
Outer Dia.(±0.20mm)
|
8.50
|
Rip Cord
|
Nylon
|
Electrical & Physical Characters
|
|||
Rating
|
75℃ 30V
|
||
Conductor Resistance
|
Max 78.8ohm/km at 20℃
|
||
Dielectric Strength
|
Min AC1.5KV
|
||
Spark Test
|
5.0KV
|
||
AC Leakage Current Through overall Jacket
|
AC 1500V <=10mA
|
||
Insulation
|
Unaged
|
Tensile Strength
|
16.5 Mpa
|
Elongation
|
500%
|
||
Aged
|
Tensile Strength
|
14.2 Mpa(100℃ 168h)
|
|
Elongation
|
250%(100℃ 168h)
|
||
Jacket
|
Unaged
|
Tensile Strength
|
13.8 Mpa
|
Elongation
|
150%
|
||
Aged
|
Tensile Strength
|
11.7 Mpa(100℃ 168h)
|
|
Elongation
|
80%(100℃ 168h)
|
||
Cold Bend Test
|
-20℃ 4hours No Cracking
|
||
DC Resistance Unbalance
|
Max 5%
|
||
Pair-to-Ground Capacitance Unbalance
|
Max 3300pF/km
|
||
Characteristic Impedance
|
1~500MHZ 100±15OHM
|
||
Propagation Delay
|
500MHZ Max 536ns/100m
|
||
Delay Skew
|
1~500MHZ Max 40ns/100m
|
Application:
1.Ethernet;10 Base-TX;ATM; Trunk Cabling;
2.Widely apply to network wiring structure and transmission media, such as audio,video,digital communication, message .
3.It commonly uses for connecting computers with other Ethernet devices. Such as, DSL/Cable Modem hubs, switches, routers, Etc
Production Line And Quality Test
Frequently asked question (FAQ)
Q: Are you a cable and wire manufacturer?
— Yes, we are a professional wire and cable manufacturer.
Q: Can you offer a discount on cables?
— The price is negotiable according to the specification and quantity.
Q: Can you offer FREE samples?
— Yes,FREE samples are available, you just take care of the freight fee.
Q: What about your MOQ?
— Usually, our MOQ is 5000 Meters, but we’ d love to talk about your MOQ.
Q: Do you accept customize cables?
— Yes, we are more than happy to make OEM and ODM for you.
Q: How long is the lead time?
— Usually it’s about 10-14 days.